The catalytic converter works by converting harmful exhaust gases, such as carbon monoxide, nitrogen oxides, and hydrocarbons, into less harmful emissions, such as carbon dioxide, nitrogen, and water vapor. This process is achieved through a chemical reaction that takes place within the converter. The converter is made up of a ceramic or metallic core coated with precious metals, such as platinum, palladium, and rhodium, which act as catalysts to facilitate the chemical reactions.
The catalytic converter for the Dodge Ram 1500 Pickup 1996-1999 with a 3.9/5.2/5.9L engine on the left exhaust pipe is designed to fit seamlessly into the vehicle's exhaust system. It is constructed with high-quality materials that are resistant to corrosion and wear, ensuring that it will last for many years and continue to effectively reduce harmful emissions. Proper installation and maintenance of the catalytic converter are crucial to its performance and longevity.
Carfitment | ||||
OE NO. | Car Fitment: | Mold | Year: | |
5201 9293, 5202 0056, 5210 3201 | Dodge Ram 1500, RAM 3500, Ram 2500 | 5.9L, 10 Cyl. 8.0L 7990cc 488cid, 3.9L 3906cc, 5.2L 5211cc, 10 Cyl. 8.0L 7990cc 488cid, 5.9L | 1996-1998 | |
Product name | Dodge Ram 1500, RAM 3500, Ram 2500 | |||
Model Number | DJN601 | |||
Brand Name | DJN | |||
Emission Standard: | EURO 2/3/4/5 | |||
Material | Inside : ceramic(honeycomb) substrate 400cpsi with mat | |||
Shell :304 or 409 # stainless steel shell,stainless steel pipe | ||||
Oxygen sensor ports | Yes | |||
cpsi | 400 /600/800 | |||
Wall thickness | 0.09±0.025 | |||
Warranty | 30000 miles performance/2 years | |||
Packaging: | Air bubble film and Carton Packing | |||
MOQ: | 50 pcs | |||
Supply Ability | 1000 Piece/Pieces per Week | |||
Place of Origin: | Jiangsu | |||
SAMPLE ORDER: | Accept | |||
Condition | new | |||
Function | reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency; | |||
Service | Customers' specific demands available, design drawings are welcomed. OEM service is accepted | |||
Supply Ability | 1000 Piece/Pieces per Month | |||
Packaging & delivery | Air bubble film and Carton Packing, inside fix the product decently with expanded material | |||
Port | Shanghai/Ningbo | |||
Lead time: | 10-30 days . | |||
Active catalyst ingredients | Pt, Pd, Rh, and rare earth elements | |||
Shape | round, oval, race track |